简体
|
繁體
|
English
服务热线:852-3150 8330
Home
About Us
Investor Relations
Equipment
Transportation vessel
Rui Gang Ting 33
Flat Top Barge
CCL-HKR3
Grand Richly FB-101
CCL-HKR 2
Fai Yue 3218
Dumb lighter
Chang Sheng316
Chang Sheng311
Chang Sheng310
Chang Sheng 309
Chang Sheng 308
Chang Sheng 307
Chang Sheng 306
Cutter Suction Pump Dredger
ASAN HO
Grab Dredger
Teng Sheng 88
Chung Hing 50
Pacific 38
Pacific 28
Anchor boat
Chang Sheng 809
Non-propeller split hopper
AOM Hopper 3
Wurtol
Rui Gang Bo 10
Rui Gang Bo 11
Chang Sheng 2002
Chang Sheng 2001
Tug Boat
Chang Sheng812
Chang Sheng811
Rui Gang Tuo 812
Rui Gang Ting 6
Rui Gang Tuo 808
Chang Sheng 802
Chang Sheng 801
Fook Sing 202
Chang Sheng 803
Hai Tuo 806
Sand Drive Barge
Hai Zhuang Bo 38
Floating Jetty
Bridge 28
Piling Equipment
Piling machine JZB90B
Hydraulic Vibration Hammer ICE V360
Hydraulic Vibration Hammer HH11
Hydraulic Vibration Hammer HHK9A
Hydraulic Vibration Hammer DZJ-120
Pile hammer HHK16S
Hydraulic Vibration Hammer ICE1412
Lifting Equipment
Hitachi KH1000
Crane Kobelco 7250-2f
Crane Kobelco 7075 45T
75 Ton Crawler Crane
50 Ton Crawler Crane
Kobelco 7150/7055
IHI CCH1500HD
Sumitomo Ls-568HD(150t)
Earth-Moving Machine
Shan tui SD22W
Komatsu D61P
Sumitomo SH350LHD-5
Sumitomo SH350HD-5
Project
A.EPC
Electricity Generation Facility-Design & Construction of offshore water inlet & warm water discharge channels
Indonesia Batam Shipyard Terminal and Channel Dredging Project
Teqal Buleud wharf Project(Design and Build)
B.Dredging and Reclamation
Proposed Reclamation for Seli Tanjung Pinang (Phase II)Development (STP2)Package(I)
Lammor Power Station Extension -Site Formation
Wan Chai Development PhaseII - Marine & Reclamation Works
Wan Chai Development PhaseII (Central-Wan Chai Bypass at Wan Chai West)- Earthwork for Site Formation & Structure
Shatin-central link-Advanced Works for Cross Harbour Tunnels
Hongkong-Zhuhai-Macao Bridge Hongkong Link Road-section between Scenic Hill and HK Boundary Crossing Facilities
Vietnam ha tinh steel mill project
Nova Zona Urbana reclamation area E1 earth fill and dam construction project
C.Pier and Marine Foundation Construction
Indonesia Peacock Cement Grinding Project Supporting Specialized Wharf Engineering Projects
Indonesia Alumina Jetty Package
Permanent Aviation Fuel Facility at Area 38, Tuen Mum
Central Reclamation Phase III
Central Pier No.2 at Central Reclamation
Stonecutters Bridge-Eastern and Western temporary Jetties
Marine Work for the Re-provisioning of Wan Chai Ferry Pier
Black point gas supply project
Hongkong-Zhuhai-Macao Bridge Hongkong Link Road-Tuen Mun to Chek Lap Kok Link
Hongkong-Zhuhai-Macao Bridge Hongkong Link Road-section between HKSAR boundary and Scenic Hill
Papua cement production line project supporting Pier Project
Bali 3x142MW Coal Fired Power Station-jetty project
D.Marine Transportation and installation
Stonecutters Bridge-Marine Transportation of main span segment
E.Seawall and Revetment
Pltu 2 Jawa Barat Palabuhan Ratu 3X350MW-Port Works
F.Environmental Construction
Regulation of Shenzhen River
Tseung Kwan O-Lam Tin Tunnel-Road P2 and Associated Works
G.Others
Kai Tak Development-Stage 3 Infrastructure Works for Develpments at the Southern Part of the Former Runway. The Sub-contract Works-Supporting Underground Structure and Adits Excavation Works
Central-wan chai bypass tunnel-North point section and Eastern corridor link
Shenzhen to Tai Po twin Submarine Gas Pipeline
Construction of Sewage conveyance system from North point to Stonecutters Island
Shatin-Central link - Kai Tak Barging Point Facilities
Contact us
Equipment
Your current position:
Home
Equipment
Lifting Equipment
Hitachi KH1000
Hitachi KH1000
Max.Lifting Capacity
:180T
Max. Crane Boom Length
:36M-60M
Swing speed
:0-0.5rpm
Travel speed
:0-0.47km/h
Ground pressure
:1.3bar
Operating weight
:260T
Power plant model
:ISUZU 12PB1
Engine output
:199KW