  • Pltu 2 Jawa Barat Palabuhan Ratu 3X350MW-Port Works

    The total length of the sea rubble is 1284m, the total throw 333010.12m3, prefabricated block installation of about 13000, the construction area for the Indian Ocean and inland river estuary, sea rubbing stone, land push and prefabricated components often installed in 2-3m wave conditions Under construction, sea conditions are exceptionally poor