Project
Your current position:Home Project C.Pier and Marine Foundation Construction Permanent Aviation Fuel Facility at Area 38, Tuen Mum

  • Permanent Aviation Fuel Facility at Area 38, Tuen Mum

    80,000-ton and 40,000-ton oil tanker for high-pile pier-type per one seat, the sea pile foundation, including cast steel pipe pile a total of 100, dynamic and static load test, pile embedded rock anchor, pile mud and reinforced concrete Watering and so on. In the meanwhile, a special bubble curtain system is designed and used to reduce the noise and vibrating in the sea to protect Chinese white dolphin, A rate animal in the world. In the protection of Chinese white dolphins and the progress of the construction made a balance between to ensure the smooth progress of the project.