Project
Your current position:Home Project G.Others Shenzhen to Tai Po twin Submarine Gas Pipeline

  • Shenzhen to Tai Po twin Submarine Gas Pipeline

    A total of 500,000ton rock was delivered and filled along 32km long submarine gas pipeline from Chengtoujiao of Shenzhen to Tai Po of Hong Kong within 4 months period.